Monday, April 8

On Holiday!

A brief blog post this week as I’m away on holiday with my family at the moment.

Last week I finished the 100th FlickFleet box (that’s 1/4 of the print run and over 40% of the Kickstarter rewards completed). I also tested and posted the first FlickFleet scenario on the web. We’re hoping to build up a large collection of additional scenarios, so if you’ve designed one, please send it to us and we’ll get it up too.

The first additional FlickFleet scenario

I’ll be taking this week off, with the possible exception of some more scenario design as I play it with my family.

When I get back I'll be making more Zombology copies as we have another stocking order from our single retail supplier.

Monday, April 1

Change of Gear

For the last several weeks our focus has been on making games - Paul has been flat out laser-cutting ships and bagging bits and I’ve been spending several evenings a week making games and then most of my lunch breaks taking the week’s batch of completed games to the Post Office.

Paul is now way ahead of (even our accelerated) schedule and I’ve used up and posted the last of the bits I got from Paul at the end of February, so I can’t post any more games until we meet up and exchange bits again. I’m still making boxes and cutting dashboards, but those are now stockpiling ready for our next exchange of bits.

This frees up my lunch breaks this week, so I’m planning to try out some new scenario ideas so I can get them up on the website - now that 75 people have the game I want to ensure there’s plenty of scenarios available to keep them entertained.

Next week I’ll be on holiday with my family (16 of us!), so I’ll not be making any games, but I’m betting we’ll play some FlickFleet as I’ll be hand delivering my brother’s and sister’s copies and I think my nephew and nieces in particular are very keen to play.

Until then, I'll be crafting another batch of boxes, etc. that will take us to over 100 completed games - that's a quarter of the run! I've also done a little Zombology this week too - I've still got 49 of those to make (20 of which are for Kickstarter backers).

Back to Zombology crafting as well this week

Monday, March 25

Regular Cadence

It’s the end of March and the end of the first quarter of the year this week. I have a number of tasks I do monthly and a few I do every quarter, so in addition to shipping the 13 copies of FlickFleet I finished on the weekend I’ll be doing a Kickstarter update (monthly), financial reporting to Paul (monthly and quarterly), sending out an email newsletter (quarterly) and a board report to our board of advisers (quarterly).

It’ll be a busy week, but we’ve had a great few months and I’m looking forward to sharing that with the various groups of people who receive those messages.

As with many startups we got off to a slow start, racking up costs associated with FlickFleet development and the Kickstarter without any sales to offset them. Now that we have started shipping (and are ahead of schedule :-) ) things are looking much more positive!

I've also run out of cut ships now, so after I've posted last week's games I'll just be building up boxes until Paul and I meet up, then I can give them to him so he can start shipping too.

Monday, March 18

Now With Added Colour!

I had a really busy week at work last week and The Toddler had a cold and hence slept even worse than usual, but I still managed to get 13 copies in the post (the last of the Uprising Heroes and a prize for the design a scenario competition I held last year). On the weekend I made another 12 copies (the first of the Reinforcements tier - due in June). That leaves me with another 12 games’ worth of bits that I got from Paul on our weekend away recently. Once I’ve finished those (hopefully this week) I’ll be building up boxes again for our next exchange of pieces.

I’ve got three more weeks of crafting and then I’m away for a week’s holiday with the whole of my family (16 of us) during which I imagine we’ll play some games of FlickFleet.

At the moment I’m focusing on trying to get as many made and shipped as possible before we move house in the next 2-3 months. 

Meanwhile over on the Kickstarter page a couple of people have asked if it's possible to colour the etching on the Deluxe ships so the names are more legible from a distance. Paul's been experimenting and come up with these results:

Colourful Dreadnought!

He drew in the line with a Sharpie pen and then quickly wiped off the excess with a WD-40 soaked paper towel!

Monday, March 11

Uprising Heroes Complete!

The first deluxe tier in our FlickFleet Kickstarter was set for delivery in March 2019. The Kickstarter completed on the 8th Dec and we didn’t get the funds until the 21st (by which time I was already on Christmas holiday!). We didn’t start ordering things until early January and the laser cutter wasn’t fully operational until early February, so it was always going to be tight, but I’m delighted to say that I finished the last of the 52 copies we needed to make last night (Paul is way ahead of me!) and I’ll be posting them all this week - with two weeks to spare before the end of the month I’m very hopeful that they’ll all arrive on time.

The last few copies of the first tier of rewards

We also been getting people sharing pictures of their received copies on twitter and Facebook and even some pictures of it in play at Airecon this weekend :-)

It feels great to be making and shipping copies on time and also to see it out the wild with people enjoying it.

I’ll be sending out the next Kickstarter survey this week and hope to start shipping the next tier of rewards (due in June) next week. I should be able to do about thirty of those before running out of laser cut bits at which point I’ll have to meet up with Paul again to get some more.

I’ve also been thinking about what's next after FlickFleet fulfilment completes. I’ve a couple of game ideas that meet the Eurydice criteria (fast, fun and unique) but they all require a decent chunk of work before they are ready (if ever).

Plenty to keep me busy!

Monday, March 4

FlickFleet in Flight!

As I mentioned last week, we’re now shipping FlickFleet. On Saturday Paul posted 28 of the 30 copies he’s done (he’s hand-delivering the last two to friends) and over the weekend I made another 11 copies of my bits and added the bits Paul gave me last weekend to them and I’ll be posting those during my lunch breaks this week.

Paul’s postage piles!

The first and last groups of games were always going to be the tightest - the first because we had to order everything and get the laser cutter set up and running properly; the last because there’s well over 100 of them. I’m delighted that we’re on track still - so many Kickstarters deliver late, to be making all the games by hand and still hitting our deadlines is a real achievement, and it’ll set us up nicely for future Kickstarters - we’ll have a reputation for trustworthiness in terms of delivery that can only be earned by coming through on your promises.

The next challenge will be that we’re moving house in the next few months which will obviously be disruptive - I want to get as many copies shipped before the move as possible to minimise the disruption. Back to the crafting board!



Monday, February 25

Shipping This Week!

This weekend Paul and I and our families met up for a joint long weekend. We ate and drank well, hung out and chatted, played with the kids and got some gaming in, but most relevant to this blog is the FlickFleet progress. Paul had spent last week frantically laser cutting deluxe sets and I was measuring and cutting box tops. Each FlickFleet deluxe edition is signed, numbered, enscribed with a message and optionally personalised.

I brought 30 finished boxes with the rules and dashboards in on holiday and Paul brought 45 deluxe games’ worth of ships, wooden bits and dice, plus two standard copies for the two backers at the Uprising Hero (first to ship) level who got a standard copy as well as a deluxe one.

During the weekend Paul and I numbered, enscribed and both signed those 30 finished boxes, plus we numbered and signed the 48 box tops I’d brought with me that were cut but not assembled yet.

That will allow me to ship the 45 games’ worth of bits as I make the boxes for them, and Paul to ship the 30 boxes as he cuts and bags more bits, we expect to ship all the Uprising Hero pledges before mid-March, so they should arrive by the end of March as promised on the Kickstarter.

I also made a jig for the box top blanks last week too, which I think will significantly speed up making them as I put the measurements on it once, rather than measuring every sheet. I’m going to make one for the box bottoms this week and time it to see how much time it saves - it felt like quite a lot, but I don’t have the data yet! I still have 345 games worth of box blanks to make, so a saving of a minute or two per game will save many hours of work in total.

It’s really exciting to be shipping the games this week - our baby will be in peoples’ hands shortly - I hope they enjoy it as much as we and the reviewers do!

Monday, February 18

Switcheroo!

I’ve little progress to report this week - I’ve been travelling in the US all week, first a couple of towns around Boston, MA and then just under 18 hours in Raleigh, NC. 

I had two opportunities to do something gaming-related while out there, but sadly achieved neither. I was hoping to go back to The Castle Board Game Cafe in Beverly after work on Tuesday and then get a late taxi down to Milford, but as it turned out that day a snow storm came through Massachusetts so we finished work early and tried to get out ahead of the storm. We didn’t succeed - the 57 mile journey took us three hours!

The second attempt was entirely unexpected and abortive. I was sat in the hotel in Raleigh eating breakfast and I mentioned it on Twitter. Rob of Coin Flip Games, one of our #CraftWednesday stalwarts, got in touch to see if we could meet up. Sadly I was only free for the next hour, and he couldn’t get over to my location in time. It would have been cool to meet up in person, but sadly not to be. I get down there once a year though, so I know better for next year! (Last year I met W. Eric Martin of BoardGameGeek news for a video segment and to show him FlickFleet).

Paul has had a better week though - the acrylic arrived on Tuesday - so he’s now started cutting and etching the deluxe edition ships in earnest.

Etching complete!

We’re meeting up this weekend for a long weekend with our families. We’ll hang out, play some games, hopefully test my new idea for the first time and swap FlickFleet components. I’ll give him boxes with dashboards and rules inside and in return I’ll get the bagged up ships and wooden pieces. When we get back we’ll both start combining what we make with the stock from the other half and simultaneously start shipping the first set of Kickstarter physical rewards. It’s getting exciting!

Monday, February 11

Off to Snowy Boston!

Last week was spent delivering Zombology copies to Travelling Man for another stocking order (they are our only retail stockist: a chain of four games stores in the north of England - but they have single-handedly sold a quarter of the print run!), starting to make a few more to replenish our stock pile which has just been cleaned out, and trying to get ahead of the game on FlickFleet stock.

Meanwhile Paul has been completely redoing the laser-cutting files I sent him to support the etching mode on our laser cutter  and then doing the test cut so we could go ahead and order the bulk acrylic.

A deluxe fleet

I’m in America all week this week for work (I’m posting this from an airport coffee shop on the way to Boston), so I wanted to get some stock stacked up to stay on track of fulfillment despite taking this week off crafting. Our accelerated plan had 26 finished last week and 35 this week, but I only managed to get 30 boxes and 12 games' worth of dashboards done before I left - I’ll be catching up slowly over forthcoming weeks. 

This week I was planning to go to The Castle Board Game cafe in Beverly, MA on Tuesday night to demo FlickFleet and Zombology, but the weather tomorrow is now looking like we’d be better heading to our next stop as early as possible as they are expecting heavy snow on Tuesday - we don’t want to get snowed in to the wrong city!

When I get back I’ll have just under a week to get some more FlickFleets made up before we go away for a long weekend with Paul and his family. The plan is to swap the boxes, dashboards and rulebooks that I’ve made with laser-cut ships and wooden pieces that he has bagged so we can both start shipping copies on our return!

After a few weeks of frantic crafting, my hands could do with a break this week!

Monday, February 4

Stocking Up

FlickFleet construction is continuing with boxes getting labelled and filled with ship dashboards and rules in Newcastle and the wooden pieces arriving and laser cutter experimentation happening in York. 
 
The first batch of finished boxes

I’m off to Massachusetts for work in a couple of weeks so I’m trying to get ahead of the game as that week I’ll not be able to do any construction (side note: if you’re near Beverly, MA on the evening of Tuesday 12th February, why not pop along to The Castle Board Game Cafe - I’ll be there with my FlickFleet prototype and Zombology).

My focus before that trip will be stacking up FlickFleets that are as finished as I can get them, but also some more Zombology stock. I’ve currently got 15 finished Zombology games at home. Five of those are for the first few batches of Kickstarter backers, so stock is 10. One of my goals for this year was to keep five Zombology in stock - I've had a couple of times recently when I’ve not had enough finished stock to fulfill orders.

I’m in that boat again :-( This week I got another stocking order from my local FLGS chain for ten more copies - I’m all out! I’ll have to fit some Zombology crafting in around the FlickFleet work. The chain have now taken over one quarter of the whole print run and account for over a third of all sales!

On the upside, Paul has now sorted the deluxe laser etching - we’re all systems go!

Testing the etching

Monday, January 28

Productive Week!

This week was all about getting started in earnest on the FlickFleet fulfilment. Unlike most Kickstarted games, FlickFleet is hand-crafted so rather than sending the artwork off to printers in China and then waiting months for stock to appear we’ve ordered all the bits for delivery to our houses and we’re going to be busy hand-crafting them for the next several months. The downside of this approach is that we have less time available for designing and playtesting new games and less free time in general, the upside is that we can start shipping games way earlier and do a much smaller print run which has less risk.

This is a lot of greyboard

This week I’ve collected the greyboard from the printers and made 30 blank boxes. The printer found things took longer than they expected so I don’t have the artwork yet (I’m getting most of it on Tuesday), but I’ve already made 30/52 of the boxes I need by the end of March.

A stack of 10 boxes - 90 minutes' work!

The wooden pieces also arrived (to my house, not Paul’s :-( ) and Paul got the laser cutter installed, set up and received training on its use (he took 15 pages of notes!). He’s already got it working and has worked out the best settings for the standard copies and is now trying to find optimal settings for the deluxe ship etching.

Laser cutter works!

Once we’ve done a test of the etching on the final sheets we can order those (145 each of red and grey - 150kg / 1.3m3!). But I want to make sure everything works fine before we spend £2,000 on acrylic!

This week I’ll start wrapping those 30 boxes with their labels. Paul and I are meeting up for a weekend away in about four weeks, so when we do we’re going to swap boxes and bits so we can both start posting games on our return.

At this point everything is still on track! Yay!

Monday, January 21

Incoming!

Over the last couple of weeks I’ve spent my lunch breaks at work finalising things, double checking them and placing orders. Until now the only things to arrive have been the dice and some test acrylic for commissioning the laser cutter.

Enough acrylic for 5 games
(but actually for testing laser cutter)

This week things move up a gear as the greyboard for the boxes arrives (collecting tonight), the artwork arrives (I’ll be collecting it on Thursday I hope),  the laser cutter arrives (installation, commissioning and training Paul on Friday) and hopefully the baggies and all the wooden bits will arrive too.

Construction can begin!

Paul’s family and mine have a long weekend away booked at the end of February, so we’re intending to swap finished boxes (packed with rules and ship dashboards) and baggied bits and ships, that way we can both start shipping games on our respective returns home. 

We have 50 packages to ship by the end of March, and the first one won’t leave until the end of February, so it’ll be tight, but hopefully we’ll get it done.

The fact that the two halves of the games are being manufactured 100 miles apart complicates things a bit, but we don’t think it’ll cause us a problem for the Kickstarter fulfilment- we’ll just need to keep meeting up for weekends :-)

Now, time to start crafting some boxes!

Monday, January 14

Spend! Spend! Spend!

A week ago we had the Kickstarter funds in our account and we were ready to start paying for things.

 7 kgs of dice!

Half of it is now gone! We’ve ordered the dice and they’ve arrived; a proof of the artwork and that’s arrived, been assembled and proof-read - the rest of the printing will be ordered today. We’ve ordered the wooden pieces and baggies (delivery in a couple of weeks) and the laser cutter (about a week away). Things are fast underway! 

First assembled box with final art

To meet our Kickstarter commitments we need to craft 270 FlickFleets and 27 Zombologies by the end of December. I have a crazy plan in my head where we try to get them all shipped by the end of August instead - which simplifies the bookkeeping somewhat as that’s the end of our financial year. 

However that plan involves making 10 copies every week between now and the end of August. We can have 5 weeks off for work travel and holidays, but that's still quite a stretch!

I was hoping that it would take me about 20 minutes to do my part (making boxes and cutting out ship dashboards), but the first attempt took 32! That’s nearly six hours of crafting a week. That doesn’t sound like a lot until you realise the time I have available for crafting is usually 9-10pm - so that’s 6 out of 7 nights every week!

I’m hoping I can speed that up a bit - the boxes were made out of too thick board (the printers had run out of the right thickness) which took longer to cut and I’d run out of tape so for the proof (my copy!) so I just did the corners without tape - using the box labels to hold them together - which was a bit of a faff and definitely took longer. I’m also hoping there will be time benefits from doing a few copies at a time - less task switching should be more efficient.

At the moment things are all still up in the air though - it’ll be good once construction has begun in earnest and these things are all a bit better understood!





Monday, January 7

And So It Begins...

This week we are placing the orders for the wooden bits, the dice, the baggies, a proof of the printing and the laser cutter. FlickFleet is off to the races!

We've got to make 273 of these in the next 12 months!

We hit our deadline for the last pledge level (the Print and Play files by the end of December), now we need to make 50 deluxe copies of FlickFleet, 2 standard copies of FlickFleet and 3 copies of Zombology by the end of March. I’m hoping we can do more than that, as I’d like to get ahead of things and ideally deliver all the rewards before the deadlines (the December one is currently the most work, so the more we can do to get ahead of things early the better).

I’ve finished off the box art and I’m now re-jigging the laser cutting files again to fit everything on the laser bed (which is slightly smaller than I was expecting).

I’ll get a proof of printing before the end of the week and then, assuming that’s all ok, I can go ahead and order the rest of the printing.

In the meantime I finished two of the three Zombology copies we need by March last night and will be doing the third tonight. Then I'll build a few for stock in case of website orders or another stocking order from our retailer (singular!).

The next few months are going to be pretty busy!

Monday, December 31

The Early Bird Gets the Digital Reward

Tomorrow is the beginning of 2019 and around the busy family Christmas break I’ve managed to get the first steps of FlickFleet Kickstarter fulfilment completed. We’d set the delivery date for the Print and Play version to December 2018, which considering the Kickstarter didn’t finish until the 8th of Dec, we didn’t get the funds until the 28th and we had Christmas and family holidays arranged was probably a bit optimistic. But the good news is the P&P files are done and I will have sent the email to all the people by the end of this evening.

With the funds now cleared in our bank account we are also now ready to order the printing, wooden pieces, dice and laser cutter. It’s all go!

Monday, December 24

Merry Christmas!

I’m now in Bristol celebrating Christmas with my family and my in-laws - so this week’s blog will be pretty brief.

I just wanted to wish all of you that celebrate it a very Merry Christmas and wish everyone a happy, healthy and successful 2019!

Paul and I are taking a well earned break - but we’ve been gearing up for FlickFleet Kickstarter fulfilment over the last couple of weeks, so we’re ready to hit the ground running in 2019. We’re on track to deliver the P&P rewards as planned this month, and have been refreshing all the quotes for the laser cutter and all the materials. And Kickstarter told us on Monday they had released the funds and we can expect them within a couple of working days (Thursday?) - so it’s all go!

Monday, December 17

Kickstarter Data Deep Dive

Paul and I chose to go to Kickstarter for FlickFleet because we needed funds up front for the laser cutter purchase and the raw materials for making the games.

We have an unusual two-phase campaign, and this was our first Kickstarter which will skew things I’m sure, but I wanted to look into the data we collected (some permanent, some transitory) and see what we can draw from it, and by sharing it here I hope there is something useful for you too.

We went into the project knowing that our audience wasn’t big enough to succeed. We needed help. We had figured on an average pledge of £31 (standard copy plus UK shipping) so we needed 387 backers. Our mailing list was 135 people and not all of them would want a copy, I guessed around 30% (40). So we needed to find another 347!

The fact that we were going to Kickstarter changed a few things about how we approached the launch - I made a few demo copies and send them to reviewers (6 in total but we only got five reviews due to a series of unfortunate events at one of the reviewers) and I also arranged a lot of podcasts and email interviews ahead of the Kickstarter launch. Usually review go out after I've hand-crafted all my pre-orders, so this attempting to build a buzz ahead of Kickstarter was all new to me. I think we did ok, the podcasts definitely helped, but we could have done with sending out more review copies I think, five reviews was only just enough.

One of the things we were really hoping for was that just the act of being on Kickstarter would help - we needed to find 347 people to support us somewhere. As it turns out we were right. 46% of the total raised during our campaign was raised through Kickstarter itself. Some of that is probably people who found out about it elsewhere and searched on Kickstarter, but a huge proportion of our total came from the platform itself. By comparison, 33% came from outside and only 19% directly from a link we shared.

Another large benefit of Kickstarter was finding out really early on that the deluxe versions were hugely popular. It allowed us to change the shape of the campaign on the fly - opening up more deluxe editions as time went on.

Downsides were plenty though. The campaign was plagued by a constant stream of cancellations, and Paul and I felt constantly at risk of further backwards progress - that made the whole experience very anxiety-inducing. In the end about 14% of backers cancelled their pledges (though a few of those eventually came back). This was compounded at the end when 18/325 backers had payment errors. By the end, this was down to 6/325 (2%) and the final total before fees was £11,891. Obviously this is lower than the amount of money we needed, but one of the joys of hand-crafting print runs is that we can change our print run size and there's no minimum, so we're still good.

A couple of things I clung to throughout the campaign were a couple of stats about successful campaigns. One, from Kickstarter itself, is that 98%  of all campaigns that reach 60% end up successfully funding. Another was that anecdotally, funding is split roughly 1/3 each between the first 48 hours, the middle and the last 48 hours. In our case the numbers were 31.8%, 48.5%, 19.7%, so even though we had a weak finish, we were well within 30% with 48 hours to go.

We had 723 project followers at the end, and we went from 12% to 17% of them backing the project after the email reminder went out. That's 37 backers at the end from the followers, or just over 5%.   

Monday, December 10

We Did It!

The good news is that our Kickstarter for FlickFleet funded and we’re getting a laser cutter in Paul’s garage and approximately 285 people are getting a copy of FlickFleet. Approximately, you say?

The pledges as written have us being on the hook for delivering 21 copies of Zombology, 137 standard copies of FlickFleet and 118 deluxe copies of FlickFleet. However, a number of people pledged over the amount to add an additional copy (or four!) or a Zombology to their order and I’ve not yet been through things in detail to get the final totals. I think total is nearer 285 FlickFleets.

As regular readers will be aware, this was our first Kickstarter and I was pretty uncomfortable about it for a number of reasons, but the biggest two were: I don’t like to owe people for things (I don’t usually take payment until the game is ready to ship) and not knowing what we’re getting into until the project completes.

The first has just been realised (325 people have just had their credit cards charged) and the second has now abated - once I’ve tallied the special pledges we will know exactly what the commitment looks like.

As it turns out the worst bit of running a Kickstarter was neither of those, it was instead the month-long anxiety of ‘will we fund or not?’.

With 5 hours to spare!

It went right to the wire, with us reaching the target with 5 hours to spare and then a flurry of late adjustments as people who had helped give us the momentum and cross the line corrected back down to something they were more comfortable with. I was literally watching the seconds count down at the end, refreshing the page in case we had more cancellations that dropped us under again. It was not a comfortable experience. But we’re done, we made it and that’s behind us now.

We funded at £12,127 or 101%. Some people might look at that as a failure, but to us it’s a huge success. This was our first Kickstarter, which makes a lot of potential backers uncomfortable. We went into it with a tiny mailing list of 135 people, needing approximately 350 backers to succeed. It was always going to be an uphill struggle. But we did it!

We also made things more complicated for ourselves with our bizarre two-stage campaign that was a mixture of hand-crafted and potentially professionally manufactured games. This hugely complicated the fulfilment picture for us as we didn’t know how many games we’d be hand-crafting in our free time around jobs and families.

I think the optimal outcome would have been reaching the £40k stretch goal and then we would only be on the hook for hand-crafting the deluxe editions. The second best outcome was what we got: scraping over the line so we don’t have a huge number over people waiting on games. If we’d ended up just under the £20k stretch goals we’d have had 600-700 people waiting on fully hand-crafted games (which we’d promised within a year) and if it was just under the £40k one it would have been about 1,500 games worth of laser-cutting in the same time frame (though the rest of the games would have been professionally manufactured). So in that sense it’s a good outcome for us.

We’re now working on getting the artwork finished off, the print and play files together and the laser-cutter ordered. We’ve until the end of this month to deliver the P&P files and a couple of weeks to wait for Kickstarter to release the funds to us, at which point we can start ordering things that require up front payment.

It just remains to say thank you all for your support. Whether you backed us, shared the project on twitter, Facebook, Instagram, BGG or elsewhere, or even if you just wished us well - it meant a huge amount to both Paul and I. We literally couldn’t have done it without you.

Thank you!

Monday, December 3

Through the Wringer - Kickstarter Style

So there are only five days left of the FlickFleet kickstarter campaign. For the last 25 days, Paul and I have lived on tenterhooks, willing the Kickstarter total to go up, hoping that we can be successful at our first attempt on Kickstarter, despite my professed discomfort with it.

It's been a deeply uncomfortable experience. Had we funded very quickly, I would have found it a very different experience I'm sure. Had we clearly got a failing campaign we could have pulled the plug early and despite the disappointment we would have been able to relax and take stock.

Instead we have the worst outcome. A campaign that looks like it will finish very close to our target, either above or below. We've been watching the total crawl slowly northwards, with two steps forward and one back (about 14% of people who have backed the project have subsequently cancelled their pledge, dragging us back away from the target).

The encouraging thing is the number of project followers, so I'm still hopeful for a strong finish that tips us over the line, but it's going to be close and it's going to be nerve-wracking - that's for sure.

Stats:
Watched the video: 1,943
Watched it to the end: 1161
Following the project: 691
Backed the project: 252 (including 83 followers - so 607 followers haven't yet backed)

Can we make it? I'm still optimistic and I really hope so - as I'm more proud of FlickFleet that any of the games I've released before. But we need another 70 backers in the next five days.

In just over 5 days we'll know one way or another, until then the anxiety continues...

Monday, November 26

Two Thirds And Two Thirds

So we are very nearly two-thirds of the way through the FlickFleet Kickstarter campaign and we are just over two-thirds funded. Which is alright I think, according to Kickstarter themselves 98% of campaigns that reach 60% end up funding, so I'm still optimistic, but the last week or so have been very flat and a test of our nerves.



We've now had a few days where the total was slightly negative and lots where the total was barely above zero - we're really hoping for a big jump on the last few days (which it seems most campaigns have).

Running a Kickstarter campaign that doesn't fund immediately is incredibly stressful, especially watching the pledges come in and then get cancelled. I wouldn't recommend it for the anxious.

Still there are some signs of hope, I'm being interviewed by Paul Grogan of Gaming Rules! while I'm in the US this week, and hopefully Geek & Sundry too. The podcast interview with Coaching for Geeks goes live next weekend and we've got a decent number of people who are following the project and will be notified at 48 hours before it closes.

The marketing funnel (I hate myself for saying that!) stats for the project are currently:

Watched the video: 1,598
Watched it to the end: 888
Following the project: 603
Backed the project: 214 (including 73 followers)

So there's 530 people who are interested enough to get a notification, but haven't yet backed.

Fingers crossed!

Monday, November 19

Stay On Target!

We’re now on day 12 of our 30 day Kickstarter campaign for FlickFleet. After a strong start we’re now in the doldrums. The daily pledge total is usually around £250-£400 (we need £246 on average every day to fund) and once it was as low as £45, so we’re limping towards the line, but it’ll probably go to the wire. Most people I’ve spoken to are convinced we’ll fund (or at least that’s what they are telling us!) and Kicktraq and Backerkit’s trend analysis both have us funding too. The only concern is that Kicktraq’s lower limit from its projection cone is now under our goal £10,787 vs £12,000, and it’s heading lower each day (even if their trend is to £18k!).

Things have slowed down a bit

I’ve spoken before about my concerns about Kickstarter (Exhibit A & Exhibit B) but it turns out the biggest problem I’m (and Paul said he is) experiencing is actually the worry about will we fund. Frequently checking the total has become compulsive behaviour, which can’t be healthy. We’ve had quite a few cancellations and no information from almost all of the cancelling pledgers to help us understand why they backed (often at a high level) only to cancel hours or days later.

The one exception to that was a guy who backed and then in response to my thank you message told me how cool the game looked and how much he was looking forward to playing it with his kids. A few days later I got another message from him to say that he was cancelling that pledge because budgets were tight at this time of year. He still loved the game and the campaign, but just couldn’t afford it at the moment. I really appreciated the explanation and tweeted as much.

The story has a happy ending! One of my twitter followers (who henceforth shall be known as Legendary Steve) paid his pledge as a random act of kindness - he was blown away (as was I!) by the generosity :-)

Fingers crossed we can keep the momentum through the slow middle period that everyone experiences and enter the exciting final couple of days at least close enough to the target to make it over the line...

Monday, November 12

Off to a Promising Start

We're just under 5 days into our FlickFleet Kickstarter campaign and it's pretty intense. It seems to be going well so far (just over 40%) and there have been a couple of surprises.

First up is the deluxe editions are way more popular that we were expecting - I hoped we'd get a few pledges at that level by the end but they all went withing 15 hours! Crazy. After discussion with Paul (who will be doing the laser cutting) we've just added a few more with a later delivery date (though still ahead of the standard copies).

Prototype deluxe ships

The other thing is the number of backers we're getting directly from Kickstarter. It's over 40% which really surprised me, especially as we've not made any top picks lists or anything.

Anyway, it's all going pretty well I think, but I could really do with some sleep! Hopefully I'll get a decent night on Tuesday when I'm away for work (and getting interviewed by Gabe Barrett from The Board Game Design Lab for his podcast!).

Thursday, November 8

We're Live!

After months of wrangling with the Kickstarter page and trying to get to grips with the concept and best practices of crowdfunding, FlickFleet is finally live on Kickstarter.


We're about 6 hours in at time of writing, with 20% of the target pledged - huge thanks to all the early backers - Paul and I really appreciate your support.

Please take a look at the page and share with anyone you think would enjoy it.

Right, I'm off to bed now - I've not slept much in days and today's excitement has done for me!

Monday, November 5

Three Days!

I’m currently on holiday (writing this while The Toddler naps) so I’ll keep this brief!

FlickFleet is coming to Kickstarter on Thursday, hopefully about 4pm UK time. It’s our first time on Kickstarter and despite the slow growth of our mailing list and a number of very excited people by far the biggest risk is that we won’t have enough backers to hit our target.

If you are intending to back it (thanks!), please do so early to help give us the appearance of momentum which might encourage others to join in. If you don’t wish to back the project, please share it with one or two people who you think might be interested - it might be the difference between success and failure!

Thanks for all your support!

Monday, October 29

What Have I Got to Show for 15 Months?

I’m shutting down the Sole Trading company ‘Jackson Pope trading as Eurydice Games’ and transferring my assets to Eurydice Games Ltd. ahead of the FlickFleet Kickstarter in a couple of weeks time. It seems like a good time to take stock of the first 15 months of Eurydice Games.


I started the company in August 2017 with a £1,000 ‘investment’. I say investment in quotes because it was money I was putting into the company and at risk, but I wasn’t expecting a great return from it, I certainly wasn’t treating this like a stock market investment - but I didn’t want it to be a vanity project where I threw money at games that no one wanted to buy or play.

Fifteen months in and I have just under £600 in the company, so from a cash flow point of view it’s been unsuccessful. if you consider the £355 of Zombology materials I still have in stock then the company has made a loss - I’ve spent a year turning £1,000 into £930. Oh, and I’ve worked probably 150 hours of my free time for no recompense either. So woefully unsuccessful.

So why on earth am I carrying on? The one thing those numbers don’t take account of is FlickFleet. I’ve spent nearly £500 getting FlickFleet ready for market, and obviously FlickFleet hasn’t yet had a chance to recoup any of that. If you treat that as value (R&D investment?) then things look a little rosier: £1,000 to £1,420 in fifteen months, which is a pretty reasonable rate of return. Of course, if FlickFleet fails to fund and we pull the plug on it then that's wasted money, so I can't rely on it.

We're now 10 days from FlickFleet arriving on Kickstarter, so I don't have long to wait to find out...

Monday, October 22

Hear Ye! Hear Ye! FlickFleet is Coming!

This week has mostly been marketing. Which I am notoriously bad at. I’ve been trying to drum up interest and build up my mailing list ahead of the FlickFleet Kickstarter on 8th November.


A FlickFleet game in progress

I’ve written a press release and I’m halfway through distributing it to a load of board game websites (and a couple of local press that might be interested). I’ve also been arranging a load of podcasts and interviews to try to involve as many people’s audiences as possible. We’re also planning to get some flyers printed that we’re hoping to distribute to a number of UK games shops. Excitement is building. I hope it’s not too slow for a successful Kickstarter...

The limited company bank account is finally set up (this was one of the things that blocked earlier Kickstarter launch dates), so now we just need to get internet and mobile banking set up and we can start using it.

I’ve also been getting more feedback on the Kickstarter page and updating that and getting a couple of outstanding tasks around production worked out too.

It’s all very busy, and at this point it’s hard to tell whether it’s working or not. I guess we’ll know a couple of days into the campaign!

Monday, October 15

The Keyboard That Launched 1,000 Ships

I'm no Helen of Troy. Let's get that out of the way to start off with.

Last week was a good one. I've updated my Facebook and Twitter banner images with a FlickFleet pre-launch banner and also officially launched the Kickstarter campaign (coming 8th November) on Facebook, Google+ and twitter. Several people have said they're in, which is great - especially the new ones, but we're still some way from the 120 backers or so we need in the first couple of days to make it look like the project is going to succeed. The next 3.5 weeks are all about trying to drive the number of early backers up.


We've approached a couple of people about levelling up the box design, so hopefully we'll have something prettier ready for Kickstarter in November. And we're also working on a new version of the video with the real music track at an appropriate level and a couple of still images with the game name and details.

To finish off the week I went to Newcastle Gamers for the first time in months and played a bunch of games. We started as a group of four playing High Society, HMS Dolores and Kingdomino and then Drew left and we were down to three. I offered Las Vegas, Zombology, Hanabi, and For Sale to the other two guys and they chose Zombology (at this point unaware I was the designer and hand-crafter of the game). We played and 2/3 of us won with Tea. They asked for another game and the same 2 of us won with Tea again. At which point they wanted to confirm the science of tea, so we played a third game and again the same pair won with Tea! Crazy. Anyway at that point I wanted to head off so I revealed I was the designer and hand-crafter behind the game and they both bought a copy! I'm down to just two copies at home now!

This week I need to focus on getting the final video up there, picking a box artist, and sharing the press release with as many people as possible - we need to get people's eyes on the project! Any help you can provide sharing the project with people you think would like it is much appreciated - thanks in advance!

Monday, October 8

Kickstarter Voice

You get a wide range of companies and people on Kickstarter, whether doing games or something else.

There’s the large and successful companies with their videos that are incredibly polished, full of rendered animations plus high quality photos and copy. At the other end of the scale there are projects that are something that’s been cobbled together by someone by themselves - video on a laptop or iPad and fairly simple text and basic photos.

With FlickFleet we’re trying to tread the middle path. I don’t want to invest tens of thousands of pounds in the advertising and content of the page, but I don’t want us to appear too homebrew either. We’ve not got a massive fan base ready to pounce on the Kickstarter, so we need to look professional enough to be credible to people who don’t know us.


The Kickstarter page taking shape

I’ve got experience hand-crafting games and getting games professionally manufactured for me and a back catalogue of five games that I’ve published in various quantities that speak to my credibility.

Here’s a preview link to the Kickstarter page (with rough draft of the video and box art - still works in progress). What are your thoughts? Does it come across as credible? Too homebrew? Too professional? Do we sound like people you would trust to invest in?

All feedback gratefully appreciated!

Monday, October 1

Tabletop Gaming Live: Fears Unrealised

Back in June I ran a Hand-Crafting Games seminar at the UK Games Expo. I'd pitched it as a chance to watch me make a copy of Zombology live while I talked about my experiences running two games companies, but it became apparent before the event that I wouldn't be able to finish making a game in time (it takes 40 minutes when I'm focussing and I only had an hour, but that was only 50 minutes once 5 minutes had been shaved off either end to allow people coming and going). On the day I gave people the choice of watching me frantically crafting in an attempt to finish or to focus more on the talking and they chose the latter, so that's what I did and in the 50 minutes I managed to make half a box and cut out a few cards. I waffle a lot it turns out.


Alexandra Palace is pretty!

Shortly afterwards, the guys from Tabletop Gaming Magazine approached me about repeating my seminar at Tabletop Gaming Live, a new convention they were running in London in September. I leapt at the chance.

As we liaised via email in the run up to the show I told them I'd struggled to get much done in the hour at the Expo, so they gave me two whole hours of their single seminar track! Wow!

The show was on the last couple of days, so I've spent most of my weekend there. London, it turns out, is a long way from Newcastle, so first I arranged with Paul (my FlickFleet co-designer) to stay at his Saturday night. So after The Toddler was asleep I set off, arriving at Paul's just before 10pm. We had a brief chat and then I headed off to bed as we'd set our alarms for 5am. On a Sunday. Joy.

Up, showered and breakfasted we set off at 6am for the 3.5 drive from York to north London (did I mention it's a long way?). The first differences I noticed between this and the Expo were the little things. As a speaker I had a parking pass for free parking in a secure car park abutting the venue (my car was literally 10 feet from the venue wall). This was great. At the Expo I'd ended up parked a good distance from the venue, so I'd carted my bag of tricks (which weighed a ton!) around all day - no fun at all. My hand was killing me before I'd even started the cutting. Yesterday however, we went in blissfully unencumbered - safe in the knowledge that it would only take a few minutes to get all my stuff from the car before my seminar at 2pm.

I spent a few hours wandering round the trade hall, chatting to people I'd previously only met online, introducing myself and my games to a few shops who were there and having a chat with Caezar from Alley Cat Games about the Kickstarter consulting he does. It was all good. Plus it was a great opportunity to hang out with Paul, who I don't see anywhere near as much as I'd like any more (we used to live just round the corner from each other, now we're 100 miles apart).

But the time for my seminar was approaching and I had some concerns.

At the Expo (a much bigger show) I'd managed to get nine people to my seminar. Two of those were mates I'd know for years, one was a Zombology customer and another a guy I knew from twitter. Tabletop Gaming Live was clearly a much smaller show and Sunday was apparently much quieter than the day before. Would anyone come to my seminar at all? The seminar space was in a massive room, of which about a quarter was set aside for the seminars - the rest was open gaming and a cafe. Would I be stood up there, mic'd up, chatting to Paul as the sole audience member while loads of uninterested people around the room were wondering what on earth was going on? A serious risk.

I was also beginning to regret the two hours slot. 2 hours is a long time. A very long time. Especially when you're at a convention looking to try and play and buy games. If an audience turned up, how long would I be able to hold their attention? 30 mins? An hour?

As it turned out I needn't have worried. There must have been 30-40 people at the start and even at the 1.5 hour mark when I finished making the game (I actually finished it!), there were probably 15-20 people still there. A good proportion of those subscribed to our mailing list and I sold seven copies of Zombology (I only sold one at the Expo seminar - to the guy I knew from twitter) - so it was a huge success.

Then I had the 6 hour drive home, via York to drop Paul off. A great, but very tiring day!

Monday, September 24

Solid Progress at Last

Since returning from our holiday a few weeks ago I’ve been struggling to make decent progress on FlickFleet. We’ve taken some impromptu holiday, had friends to visit and weathered a long baby cold which led to sleepless nights and hence curtailed evenings.

This week I had a work trip to Manchester that was supposed to include a couple of nights in a hotel (it ended up being only one as a storm blocked all trains out of Newcastle on Wednesday evening).

With six hours of train travel and an evening in a hotel I managed make a huge amount of progress. I’ve now finished the Kickstarter page first draft and we’ve a rough cut of the video too. I’ve written a press release and am about halfway through updating the website with changes reflecting the move to a limited company. I’ve also finally completed the bank account application for the limited company too.


Kickstarter preview is ready!

The next step is to get some eyes on the Kickstarter page and get some feedback and finish off the website changes and make those live.

Finally, next weekend is Tabletop Gaming Live at Alexandra Palace in London. Paul and I will be there on Sunday (with FlickFleet and Zombology) and I’ll be repeating my hand-crafting seminar from 2-4pm. I’m hoping that with a bit longer I can answer more questions and make more of the game without having to rush the final bit. If you’re going, please come along and say hi!

Monday, September 17

An Unconventional Kickstarter

If you've been a reader of this blog for a while you'll know I'm very wary of Kickstarter. So why exactly are we Kickstarting FlickFleet?

The short answer is we can't afford not to. Zombology has broken even now, but I've still a decent stock pile to sell through, and a large chunk of the money I've recouped on Zombology sales has been invested in FlickFleet development - I have less cash on hand now than I started with. And FlickFleet is a far more expensive game to manufacturing than Zombology. Zombology is just a card game with a box, 108 cards and a rules sheet. FlickFleet has acrylic ships, wooden bits, ship dashboards, dice, a rulebook and a box.

I think FlickFleet is the most fun and approachable of the six games I've published, but if there's one thing Reiver Games taught me, it's that I don't want to be getting a bank loan to fund a large print run of FlickFleet to find out I've judged it wrong again and I'm left with a big pile of stock and little money coming in while we haemorrhage money through warehousing costs and bank loan repayments.

A photo for the box back

Kickstarter gives us a chance to judge the size of the market for FlickFleet and size our print run accordingly. It also lets us change the shape of the print run as the campaign becomes more successful.

I'm hopeless at marketing, so my best guess is that we'll fund somewhere between 50% and 125% of our target. We're setting that low in an attempt to increase our chances of success - but that brings other challenges. To reduce the target to the minimum, we're aiming for a hand-crafted run of 500 copies (half the minimum order of our professional manufacturer). So to do this we'll need to pay the kickstarter cut, then buy the raw materials for 500 games and we'll need to do the laser-cutting ourselves, so we also need a laser-cutter.

In the unlikely event that something miraculous happens and we're much more successful, the Stretch Goals are aimed at improving components for everyone (not adding in expansions and extra bits we haven't had time to properly test). And at some point the time and effort it would take us to make the hand-crafted boxes and dashboards, plus bag all the wooden components and laser cut the ships would be prohibitive - so we'll have to switch over to professional manufacturing (of at least the box, dashboards, rules and wooden bits - the status of the laser-cutting is still under investigation).

Have you seen a kickstarter that switches from hand-crafted to professionally manufactured as a Stretch Goal?

Monday, September 10

Moving Goalposts

I’m back from my two week blogging hiatus! During that time I’ve had a week long holiday, an impromptu camping weekend and a visit from my FlickFleet co-designer, Paul and his family.

Progress on the FlickFleet Kickstarter has picked up in the last week, but in total has been slower than I’d like, hindered by some terrible nights’ sleep while The Toddler had bad cough and fever.

But now that the holidays are over and The Toddler is on the mend, things are looking up. This weekend, during Paul’s visit, we discussed the kickstarter in some depth and then spent Saturday night with my mate Wilka taking some photos of the game and its components and recording the footage for the kickstarter video (with a new shorter script crafted minutes before Wilka arrived) and a videoed play-through of the game.


All the FlickFleet components

The kickstarter page is taking shape finally, it’s mostly there now, pending a few images of the game, a few more reviews and some images for the stretch and social goals. I’ll be soliciting feedback on it shortly.

We had hoped to bring it to Kickstarter last week, but we’ve clearly missed that. I’ve pushed it back to the 24th, but we’re not going to be ready for that either - so we’re now aiming for mid-October. Hopefully we’ll hit that one! But as everyone says, it’s better to wait until you’re ready than rush out a half-finished campaign to hit an arbitrary deadline you’ve given yourself.

Still disappointing though :-(

Monday, August 20

Holiday

I’ll keep this brief this week - I’m on holiday with the family in Northumberland - north of Newcastle where I live. Before I left I made some progress on the Kickstarter page for FlickFleet, finished a first draft of a script for the Kickstarter video (and recorded a very rough test to see how long it was - answer: too long).

While we’re away I’m hoping to get some games in with the family and when I return both Paul and I will be back from our respective holidays, so we should be able to make decent progress on getting FlickFleet ready.

Do you have any thoughts on the video (obviously the quality will be much better on the final one!)? What should we cut?

Monday, August 13

Kickstarter - The Rollercoaster

We’re hoping to bring FlickFleet to Kickstarter in September. The original plan was to launch on Tuesday 4th, but with out of sync family holidays and a lot going on in August, I think it’s going to have to slip back to later in the month. I’m still hopefully that we can launch in September though. The video is one of the main stumbling blocks - I’d like it to feature both of us, which means finding a day that we’re both available and so is my mate with all the kit.

The source of my current worries

So we’re still several weeks away from launch but the emotional rollercoaster has already started. Some of this is similar to the other games I’ve published as either Reiver Games or Eurydice Games: will people like my game? Can I find enough customers to make it, at least, break even?

But Kickstarter brings a couple of new dimensions to it - the month of unknowns and the debt.

Every previous game I’ve made I know exactly what I’m getting into at launch, either hand-crafting or ordering a fixed number of games at a fixed cost. I know how many hours of crafting are on the horizon and how many copies I need to sell at what margin. It could be terrifying, risky or fairly safe, but I know what it is. I know how much money is at risk and I know what my crafting future looks like. With Kickstarter however, until the campaign closes you’ve no idea what you’re on the hook for. How many backers will I get? How many copies will I have to make? What will my margins be? All of this is up in the air until the campaign closes. It’s even worse for us as we’ve set a two stage campaign - to keep the target low we’re planning a small hand-crafted run. But there’s a stretch goal to get the boxes, rules, dashboards and wooden pieces professionally manufactured and assembled. If we get close to that we’re still on the hook for hand-crafting everything. For a lot of copies. Even if we hit the stretch goal we may need to do the laser cutting ourselves (I’m still investigating options for a very large run of laser-cutting, but one of the reasons we're doing the laser-cutting ourselves is to keep costs down - there doesn't seem to be any economies of scale for laser-cutting). I’m not sure what my preferred outcome is - scrape over the funding target, just hit the professional stretch goal or something else.

In addition, there's the fact that you owe a lot of people a lot of stuff. I'm okay with the idea of crowdfunding - it makes FlickFleet a possibility, but as I've said before I'm uncomfortable about taking people's money up front. They're paying for a copy (or two!) of the game. They know it'll be a while. They must be comfortable with that or they wouldn't back it. But I've never taken money for something that's not ready yet. Even pre-orders for my previous games were just a request - I didn't take any money until I had a game ready to ship to them. I lost a few pre-orders that way, but I was more comfortable with that than owing someone for something that's an unspecified amount of time from completion. I'm hoping the discomfort around owing people games will encourage me to crank them out as quick as possible.

Exciting times. It’s not keeping me up at night yet, but it’s certainly occupying a lot of my thinking during my evenings and weekends.

Monday, August 6

Crunch Time

We're hoping to Kickstart FlickFleet in September. There's still loads to do though, so that timeline is getting tight and Paul's currently out of the country on holiday and I'll be heading off on holiday at the end of next week.

We've set up the limited company and are now getting the bank account and related guff together, while working on the Kickstarter page text and images, scripting the videos and the box art. It's all feeling pretty hectic now.

I've also been trying to build up some Zombology stock as there may well be another stocking order shortly from Travelling Man (York is getting very low on stock) and I'd like to have a decent pile ahead of the kickstarter so we can focus on FlickFleet afterwards (assuming it funds). We're offering Zombology as an add-on which allows you to get it with much cheaper shipping.

I thought my laptop power lead had died this week, which limited my options at home (lots of those tasks are hard/impossible to do on an iPad or phone), but it seems to be working fine here (I brought it to work this morning in order a replacement power lead for it). Maybe the power socket had broken - who knows.

Here's the next iteration of the box art, it's coming together slowly - what do you think?



Latest iteration


Previous iteration


First concept

Monday, July 30

Let’s Get Limited

My first games company, Reiver Games, was legally a Sole Trader - the company didn’t exist as a legal entity, it was just me, using a trading name. Had anyone sued me back in the day it would have been my personal assets (house, car, etc.) that would have been at risk.

Eurydice has been exactly the same until now - while selling a small number of hand-crafted games I thought the risk was quite low, but with Kickstarter coming up in just over a month I’ve decided to do things properly. I’m going to form a limited company (a separate legal entity) and incorporate Eurydice Games Ltd. Paul, my FlickFleet co-designer and long time Reiver Games play tester is coming on board too as another Director.

I need to get the company founded and a bank account set up as well as get the Kickstarter page together and finish getting quotes for manufacturing and shipping the various different manufacturing options. Paul has done a first draft of the Kickstarter page, so that’s coming together nicely.

Time is progressing apace, I’ve lots to do, and a holiday to take, plus I need to get Zombology back in stock too (I keep running out :-) ). Must crack on...

P.S. Don’t forget we’re running a scenarios

Monday, July 23

Win a Deluxe Copy of FlickFleet!

FlickFleet, our new 2-player space battle dexterity game, has two modes of play: pre-defined scenarios and free play where both players design a fleet that has a particular points value.


A draft of the FlickFleet box

I really prefer the scenario play and one of the things Paul (my co-designer) and I would really like to see is a large body of community designed scenarios available to play.

In an effort to kickstart (see what I did there?) that collection of scenarios ahead of the September Kickstarter for the game, we’re running a competition - with a first prize of a deluxe copy of the game.

Now very few of you have a copy of the game, so we’re not expecting expertly crafted, perfectly balanced scenarios, instead, we’re looking for ideas. The game is set in humanity’s far future when a totalitarian Imperium of Earth bestrides the galaxy. Sick of the endless oppression an Uprising has formed and they are starting to wage a civil war in an attempt to free the citizens from the yoke of tyranny.

To enter the competition, read the rules and see the examples on pages 11-15, read the capabilities of the different types of ships and then submit an entry by emailing jack@eurydicegames.co.uk with your scenario in that format. You can write your scenario from the perspective of the Imperium or the Uprising and include as many of the ships that come in the game as you want.

Entries will be judged on:
  • The scenario setting
  • Interesting asymmetry or special rules
  • With bonus points available for using common household items as scenery.

You will not be marked down for an unbalanced scenario, as we will playtest, balance and publish the best ones (with attribution!).

Entries must be received by midnight (UK time) on 31st August 2018. Winners will be chosen by me and Paul (the game designers) and will be announced by the end of September. If you choose to back FlickFleet and are declared a winner we will refund your pledge. The winner will win a deluxe copy of FlickFleet including free worldwide delivery. If we are successfully funded, second and third places will win a standard copy of FlickFleet with free delivery.

We reserve the right to publish any of the scenarios to our website (attributed to the submitter) after playtesting and tweaking for balance.

Good luck!

Monday, July 16

FlickFleet Status Report

Things have been pretty busy again this week, mostly FlickFleet focused, but also starting to build up some Zombology stock again (I ran out at the end of June).

Zombology and FlickFleet both taking shape

I’m hoping to get FlickFleet on Kickstarter in September, but to do that there’s a number things I need to get sorted first. Last week I finished off the FlickFleet preview copies and posted three of them to the US. I also made two upgrade kits that turn blind playtesting prototypes into preview copies. I’ll be getting an upgrade kit and the last two preview copies in the post on Tuesday. That’s the last FlickFleet crafting I have to do for a while.

The other things I need to do are to do the Kickstarter page and the video (which my mate Wilka is going to help with) and some company stuff.

Until now Eurydice Games has been a trading name for me. Legally the company is me as an individual. Paul, my FlickFleet co-designer and one of my main Reiver Games playtesters wants in, so he and I will be forming a limited company in the next few weeks.

From a marketing point of view I need to properly ‘launch’ FlickFleet on BGG, and in a few other places and then the last two things are to finish the box design and get some more info up on the website.

In other news, next week I'll be in Travelling Man in Manchester demoing (and selling!) Zombology. I'll be there from 6:30pm on Tuesday 24th July. If that's local to you come down meet me!

Seven weeks to go! I’d better crack on...

Monday, July 9

The Scale of Retail

In these days of wall-to-wall Kickstarters it’s easy to forget how critical retail (both online and through FLGSs) is to the success of a game.

Back when I ran Reiver Games I started off with small hand-crafted runs (like I’m doing once again with Eurydice Games). When my Multiple Sclerosis diagnosis led to a life insurance payout I decided I wanted to be a ‘professional’ publisher selling through shops and distributors. I went from selling 100-300 copy print runs to 2,000-3,000 copy runs - which in fairness I didn’t sell out of and I ended up getting rid of a load to liquidators.

With large print runs comes economies of scale, which is just as well since selling through proper channels means more people take a cut: Shops want to buy at half retail plus tax (they have to fund staff, expensive retail locations, absorb the sales tax and want to make a profit), so distributors want to pay 40%. The ideal manufacturing cost is hence 20% of retail (so a game that retails for £50 should cost you £10 to make).

With small print runs you can’t afford to sell to distributors and even selling to retail is a stretch so my whole business plan this time round was based on selling through my website and at clubs and conventions.

As feared, it’s difficult to get people’s attention in the age of Kickstarter and sales have been slower than I would have liked via my website. Sales face-to-face have been pretty good, but I don’t have a lot of time to go to conventions since weekends are my family time and I don’t want to be skipping loads of them to attend conventions. I’ve tried to make it to clubs when I can (sales have been great at Newcastle Gamers) and where possible I’ve tried to include a trip to a local club during my work trips.

But sales are slow.

A couple of months ago I popped into my FLGS, Travelling Man, and spoke to the staff about my game. They have a small press section that is full of hand-drawn comics that are printed at home and thought Zombology would be a good fit for it. By pricing the game at £13 we found a price where it was cheaper than buying it from my website including UK shipping and my cut after they had taken theirs was not too low. They took them on Sale or Return, so I only invoice them for copies sold - so there’s no risk for them of unsold stock and hence lost investment.

Zombology in retail!

In the first month they sold two of their three copies and in the second another two (I’d restocked them back up to three). Last month I met them at the UK Games Expo (I knew several guys from the chain from my Reiver Game days) and their MD wanted to take another 12 copies - four each for the remaining three shops in the chain. That month across the four stores they sold five.

It helps that I’m the only game in the section and that the box design is strong (thanks to advice on BGG), but still this is off to a great start.

Over the last ten months I’ve sold 83 copies of Zombology. Nine of those (over 10%!) have been through retail in the last three months. Despite not wanting to go into retail this time round - it just goes to show that you need to be able to adapt your plans as you gain more data.

FlickFleet is another case in point of adaptability - I was adamant I didn’t want to use Kickstarter, but the only way FlickFleet will see the light of day at a reasonable price is through Kickstarter funding of the laser-cutter so that I can do the laser cutting myself.

What changes have you made to make your game a reality or more successful?